Calculated Fields

by camel

Downloads: 23,627 (9) • Reviews: 4

Version:

1.2.9.4

Updated:

Apr 11, 2011

VAM and HR

VAM and HR

Postby kjull » Thu Mar 19, 2015 4:43 pm

Hi

I would like to create a plot showing average HR on a climb on the X-axis and climb velocity (VAM) on the y-aksis for climbs longer than a threshold level (e.g. 1km lenght or longer and average grade 4% and higher)
It this possible to do using calculated fields?
kjull
 
Posts: 11
Joined: Mon Mar 07, 2011 3:40 pm

Return to Calculated Fields

Who is online

Users browsing this forum: No registered users and 2 guests

cron